giancarlostoro 4 minutes ago [-]
I really don't get who keeps using Oracle outside of Java, and how they make their money, must be some legacy contracts or something, but Oracle has always been customer hostile, from all the things I've heard, they sound like a ransomware company (idk if they still do it, but they'd sell you the database, then "audit you" and if you used anything that wasn't in compliance, fine you, until you converted that to Oracle DB too or whatever wild stuff). I just don't get it. I get even less how its execs are okay running what could be a much more successful company so poorly. You can change Oracle for the better and become even more profitable if you change how you do business.
Take Java as a solid example, they removed JavaFX from the core of Java, which made everyone think JavaFX was dead, recently they started providing enterprise support for JavaFX, which signals its production ready, but, who wants to trust Oracle? I sure don't. I can use C# for free without any of that baggage, and if I get all sorts of stable options for a GUI, and with Avalonia (and Uno?) I can run my GUI on any OS.
ozlikethewizard 41 minutes ago [-]
Doesn't 'Force Majeure' mean exceptional events outside ones control? Pretty sure everything involved here is Oracles own making lol
chuckadams 23 minutes ago [-]
"No one could have predicted that permits and infrastructure necessary for this project's completion would be delayed". Except for every project that's needed permits and infrastructure ever.
I hope whoever buys Oracle fires Larry by email.
32 minutes ago [-]
mckirk 23 minutes ago [-]
"Well a wave hit it"
peri-cl 10 minutes ago [-]
I'm surprised to hear that solid-oxide fuel cells are apparently a non-gimmick thing now.
> "Oracle signed a deal with solid oxide fuel cell (SOFC) developer Bloom last year for 1.8GW of power, expanding it to 2.8GW of capacity in April."
Apparently this one would have been the largest SOFC installation, by far.
potatototoo99 1 hours ago [-]
Will be interesting to see what excuses these companies will come up with to justify stopping investment in AI without spelling it out. The first one was already announced: it's going to kill everyone so we need to proceed more slowly.
0cf8612b2e1e 22 minutes ago [-]
Surely this will assuage the creditors that Oracle is going to pay back its $100B+ loans.
26 minutes ago [-]
blakesterz 47 minutes ago [-]
Reuters has a non-paywalled (short) report with a bit of detail:
Finding out that Oracle has a bond rating of BBB- [1] (one step above junk bonds) feels very appropriate for such a company with such a sordid history.
'Force Majeure' is a good way to describe their incompetence.
Analemma_ 53 minutes ago [-]
Right, Oracle is at the bottom of the heap (they borrowed the most with the least initial credibility— who the fuck seriously thinks Oracle was ever going to be a major player in AI), so weakness in the market will appear with them first. But I think it will bubble its way up.
someonebaggy 42 minutes ago [-]
Oracle's specialty is extracting money from the government for everything IT-related. Why wouldn't they be a major player? Investors might not have foreseen DOGE and Grok.
apercu 1 hours ago [-]
Still too high of a rating.
someonebaggy 42 minutes ago [-]
It's based solely on thejr expected ability to replay, not their ethics.
WokeUp420 55 minutes ago [-]
The number of datacenters needing to come online doesn't add up to me. It's suspicious
kilroy123 45 minutes ago [-]
How so? It's clear the hyperscalers can't keep up with demand.
dofm 31 minutes ago [-]
Is it clear they need anything like the unbuilt capacity that is in the pipeline?
They are using tiny fractions of the data centres they claim to have "built".
There's a significant risk of a Chinese real-estate bubble here.
kilroy123 11 minutes ago [-]
What source do you have for "using tiny fractions of the data centres"?
The money doesn't seem to back this up. Why would Anthropic pay through the nose and make such desperate moves for compute?
echelon 48 minutes ago [-]
When our spot instances go away and don't come back, that's a sign that there's not enough capacity.
There is more demand for compute than there is supply, and that demand is going up.
Look at all of the things that have been and are being automated and realize that we're year 6 into a hundred year journey.
Look around you at all the things that aren't automated. They will be.
The world you grew up in won't be here for much longer. We're going through a transformation even more dramatic than the industrial revolution. There were no airplanes and then we landed on the moon.
Edit: downvotes as expected, but I'm shocked that a bunch of smart people at HN aren't taking the bet where this leads to a complete upending of the status quo. The holdout crowd needs to dream bigger.
The models are solving Millennium Prize problems, finding novel biological pathways our scientists can't see, putting every single software engineer out of the job of "coding by hand", and doing the same to designers, marketers, filmmakers, and 3D artists who used to have to operate pixel by pixel / photon by photon.
Everything is going to be AI soon.
toasty228 46 minutes ago [-]
No shit, you're telling me mixing Trump, Musk, Oracle and Softbank would end up in yet another scam? Just a way to quickly pump stocks and get money? No way duuude, who would have thought?!
DuneWarm21 1 hours ago [-]
[dead]
theturtle 14 minutes ago [-]
[dead]
bpodgursky 43 minutes ago [-]
Everyone is interpreting this as a sign the bubble is bursting, when the actual story is costs for materials and labor are going up and delays are happening because so many data centers are getting built.
If Oracle was able to build the data center under-cost and faster than expected, that would be a better sign the bubble was bursting!
toasty228 41 minutes ago [-]
What does it change exactly? It's not like gas or materials are going to get cheaper any time soon. It can burst for a whole lot of reasons, including the 2nd coming of Jesus or resources price... it's not like people have been calling AI ressource intensive for years right ?
mamonster 39 minutes ago [-]
Right, so the presumably the revenue projections aren't increasing at the same pace and the financials don't make sense anymore. Which is potentially a sign of the bubble bursting.
bpodgursky 35 minutes ago [-]
I mean the literal guidance is that Oracle may not make money on the datacenter by 2028 because they won't be able to turn it on.
How profitable a datacenter is, is kind of irrelevant to the convo, if you are unable to power it due to material shortages.
mamonster 25 minutes ago [-]
>How profitable a datacenter is, is kind of irrelevant to the convo, if you are unable to power it due to material shortages.
It isn't irrelevant, because they have to make money to be built. The debt for these projects was already issued, so you have to pay the coupons. If Oracle doesn't pay the developer is gonna suffer on their end.
Take Java as a solid example, they removed JavaFX from the core of Java, which made everyone think JavaFX was dead, recently they started providing enterprise support for JavaFX, which signals its production ready, but, who wants to trust Oracle? I sure don't. I can use C# for free without any of that baggage, and if I get all sorts of stable options for a GUI, and with Avalonia (and Uno?) I can run my GUI on any OS.
I hope whoever buys Oracle fires Larry by email.
> "Oracle signed a deal with solid oxide fuel cell (SOFC) developer Bloom last year for 1.8GW of power, expanding it to 2.8GW of capacity in April."
https://www.datacenterdynamics.com/en/news/new-mexico-regula...
Apparently this one would have been the largest SOFC installation, by far.
https://www.reuters.com/business/oracle-cites-force-majeure-...
[0] https://finance.yahoo.com/technology/ai/articles/oracle-cite...
[1] https://www.spglobal.com/ratings/en/regulatory/article/-/vie...
They are using tiny fractions of the data centres they claim to have "built".
There's a significant risk of a Chinese real-estate bubble here.
The money doesn't seem to back this up. Why would Anthropic pay through the nose and make such desperate moves for compute?
There is more demand for compute than there is supply, and that demand is going up.
Look at all of the things that have been and are being automated and realize that we're year 6 into a hundred year journey.
Look around you at all the things that aren't automated. They will be.
The world you grew up in won't be here for much longer. We're going through a transformation even more dramatic than the industrial revolution. There were no airplanes and then we landed on the moon.
Edit: downvotes as expected, but I'm shocked that a bunch of smart people at HN aren't taking the bet where this leads to a complete upending of the status quo. The holdout crowd needs to dream bigger.
The models are solving Millennium Prize problems, finding novel biological pathways our scientists can't see, putting every single software engineer out of the job of "coding by hand", and doing the same to designers, marketers, filmmakers, and 3D artists who used to have to operate pixel by pixel / photon by photon.
Everything is going to be AI soon.
If Oracle was able to build the data center under-cost and faster than expected, that would be a better sign the bubble was bursting!
How profitable a datacenter is, is kind of irrelevant to the convo, if you are unable to power it due to material shortages.
It isn't irrelevant, because they have to make money to be built. The debt for these projects was already issued, so you have to pay the coupons. If Oracle doesn't pay the developer is gonna suffer on their end.